Mr. Heater MH80CV Provozní pokyny Strana 5

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 20
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 4
Operating Instructions and Owner’s ManualConvection Construction Heater
E-5
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS
ARE FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 2: LIfT OUTER SHELL STRAIGHT UP. CARE MUST BE TAKEN
TO PROTECT HANDS DURING LIFT.
STEP 3: LIFT OUTER SHELL UNTIL ALL THREE CLIPS
ENGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS,
THE SCREW HOLES WILL LINE UP.
STEP 4: LOCK THE CLIP INTO PLACE WITH 3 SCREWS AS
SHOWN. THE HEATER MUST NOT BE OPERATED UNLESS THE
OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED INTO
PLACE.
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS
ARE FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 1: HEATER AS RECEIVED OUT OF BOX. BEFORE
LIFTING OUTER SHELL PROTECT HANDS. NEVER
GRASP BARE METAL WITHOUT HAND PROTECTION.
Make sure clip goes into
slot in lower shell.
3 Places
Lock shells together and
clips in place with screws
in each clip. 3 Screws
Total.
Zobrazit stránku 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Komentáře k této Příručce

Žádné komentáře